INVESTOR BRIEF · NOVEMBER 27, 2026

BIG SUN AI Data Center
Build on the existing Hukou facility

The plan starts with the Hukou site and introduces AI data-center capacity in phases, seeking an earlier path to leasing than a greenfield build. Engineering, customer onboarding and profit targets remain conditional.

Figures are plans or conditional scenarios in the report, not promises of returns, dividends or listing.
BIG SUN AI Data Center one-page investor poster
One-page investor summary · 2026-11-27
OVERVIEW

Start with an existing site and validate each condition

The existing factory may reduce some land acquisition and building lead time compared with a new project. It does not remove retrofit capital needs. Power, cooling, fire safety, MEP and permits must be confirmed against engineering and customer requirements.

Initial facility scenario6 MWPhased leasing plan
Model efficiency assumptionPUE 1.3Subject to design and operating data
Model occupancy assumption80%Leased-load scenario
Target share capitalNT$200MCurrent fundraising plan
Capacity conversion: 6 MW of facility input divided by PUE 1.3 implies about 4,615 kW of IT load; the revenue scenario then applies 80% occupancy. This is a model calculation, not approved power capacity or verified deliverable IT capacity.

Investment thesis

The initial scenario uses 6 MW and phased customer onboarding. Rental revenue can be designed around customer IT load and service scope, with expansion based on occupancy, demand and available power. Integrating renewable energy, storage and energy management may broaden energy-efficiency and low-carbon services; benefits require validation with design and operating data.

EXISTING HUKOU FACILITY

Site and MEP equipment photos

The images show the building, incoming power, cooling and MEP control equipment included in the report. Photos do not verify equipment condition, available capacity or operational readiness.

Usable capacity, equipment condition and retrofit requirements remain subject to site inspection, power approval, engineering design and commissioning.
MARKET REFERENCE & PRICING

Separate official service information from third-party prices

The report uses Chief Telecom as an industry reference and distinguishes official information from third-party colocation prices.

Chief Telecom published information

AI rack specifications and pricing

  • The report says Chief Telecom plans to invest about NT$3.3 billion in an AI data center in Huwei, with operations expected in the second half of 2028.
  • Published AI rack specifications are about 10–150 kW per rack; AI services are quoted by project.
  • General colocation pricing items include setup fees, monthly rack rent and bandwidth rent. The official page does not publish one fixed monthly price for all AI customers.
  • Media have quoted Chief management as saying LY2 AI rack rent is above traditional racks, without publishing an absolute rate that can be directly applied.
Third-party conventional colocation reference

Neihu service examples

  • 20U / 1 kW: about NT$27,000 per month.
  • 42U / 2 kW: about NT$45,000 per month.
  • Equivalent to roughly NT$22,500–27,000 per kW per month.
  • These are third-party conventional colocation prices, not Chief's official AI data-center quote or high-density AI rack rates.
Pricing position: NT$4,000–6,000 per kW per month is the base rent scenario; NT$10,000–12,000 is the high-density AI rack target scenario, about 47%–63% below the third-party conventional reference. Service and cost structures differ. Power, cooling, bandwidth, operations and SLA scope must be confirmed with customers and validated by formal quotes and contracts.
REGIONAL COMPUTE & POLICY CONTEXT

Compete for regional deployments with transparent compliance

The report states that in November 2026, the US Department of Commerce BIS announced new controls on advanced-computing chip exports and overseas remote-compute access. It lists additional licensing requirements for certain advanced chips shipped or transferred to Singapore, Malaysia, Indonesia, Thailand and Brazil. Overseas data centers providing substantial remote compute to entities in certain restricted regions may also face licensing and customer-screening requirements.

These are export and remote-compute licensing controls, not a blanket ban on all Southeast Asian data centers obtaining GPUs. Taiwan projects are not automatically exempt. Equipment access depends on chip model, end customer, use and applicable license conditions.

The opportunity thesis is that customers reconsidering facility locations and supply chains may consider Taiwan for data-center, compute and enterprise services. Transparent customer screening, equipment provenance and compute-service processes are needed.

RENTAL & PROFIT SCENARIOS

Two leasing assumptions for a 6 MW facility scenario

Values are transcribed from the supplied report. Each depends on completed engineering, actual power, customer demand and operating costs.

Scenario itemBase
NT$4,000–6,000 / kW / month
High-density
NT$10,000–12,000 / kW / month
Annual rental revenueNT$177–266MNT$443–532M
Gross profit (70% assumed)NT$124–186MNT$310–372M
Net profit (50% assumed)NT$88.62–133MNT$222–266M
EPS (20M shares)NT$4.43–6.65NT$11.08–13.29
Net profit / NT$200M target capitalabout 44%–66%about 111%–133%
Model assumptions: 6 MW facility input, PUE 1.3, 80% occupancy and about 4,615 kW modeled IT load; occupancy is applied to revenue. Gross margin 70%, net margin 50% and 20 million shares are management scenario assumptions, subject to a formal cost model and operating results. A 50% outside ownership share corresponds to about NT$111–133M annual net profit in the high-density scenario; this is not a dividend commitment.

Conditional valuation reference

The report uses Chief Telecom's Nov. 26, 2026 closing price of NT$313.50 and P/E of about 19.7. Applying that multiple to high-density scenario EPS of NT$11.08–13.29 gives an illustrative NT$218–262 per share. BIG SUN and listed Chief differ in operating history, scale, risk and liquidity. This is not a target price, listing commitment or capital-gain guarantee.

FUNDRAISING & INVESTOR RIGHTS

Two payments, two sets of rights, documented separately

Current fundraising plan

  • Target share capital for the data-center company: NT$200 million.
  • BIG SUN and outside investors are planned to hold 50% each.
  • The planned outside-investor payment is NT$25 per share: NT$10 for share subscription and NT$15 for factory-use rights.
  • The two payments differ in recipient, use and rights, and should be set out separately in the share-subscription documents and factory-use rights agreement.

Governance and investment risk

  • Governance is planned for 9 directors and 3 supervisors; actual seats, candidates and duties depend on the articles, formal resolutions and legal procedures.
  • Engineering, compliance, customer onboarding, occupancy and profit assumptions are uncertain.
  • Equity investment is not principal-protected and carries no fixed return, dividend or listing guarantee.
  • Investors should review formal documents, the financial model and risk disclosures and make an independent assessment.
CONCLUSION

BIG SUN AI Data Center is a priority physical operating investment for the group

Chief Telecom's development and market information point to demand for AI data centers, alongside substantial capital needs and long build times. BIG SUN starts from its existing Hukou factory and seeks to shorten the development path. Changes to US advanced-chip and remote-compute rules may prompt customers to reconsider regional compute and facility locations. If engineering, compliance, customer onboarding and profit assumptions are achieved, the project could become an important operating platform and support a future Innovation Board listing evaluation.

This is a strategic thesis and conditional scenario, not a promise of returns, dividends, listing or capital gains.

SOURCES & FULL REPORT

References listed in the source report

These links are reproduced from the supplied investor report. Verify source contents and dates before public use.

Complete seven-page investor report

Includes the one-page poster, Hukou facility photos, partner signing and founders meeting, full narrative, assumptions and references.

Download PDF ↓

Report dated Nov. 27, 2026; stock price and P/E data dated Nov. 26, 2026. Financials are scenarios, not forecasts or guarantees. Equity investment is not principal-protected. Formal approved and executed documents govern.