BIG SUN AI Data Center
Build on the existing Hukou facility
The plan starts with the Hukou site and introduces AI data-center capacity in phases, seeking an earlier path to leasing than a greenfield build. Engineering, customer onboarding and profit targets remain conditional.

Start with an existing site and validate each condition
The existing factory may reduce some land acquisition and building lead time compared with a new project. It does not remove retrofit capital needs. Power, cooling, fire safety, MEP and permits must be confirmed against engineering and customer requirements.
Investment thesis
The initial scenario uses 6 MW and phased customer onboarding. Rental revenue can be designed around customer IT load and service scope, with expansion based on occupancy, demand and available power. Integrating renewable energy, storage and energy management may broaden energy-efficiency and low-carbon services; benefits require validation with design and operating data.
Site and MEP equipment photos
The images show the building, incoming power, cooling and MEP control equipment included in the report. Photos do not verify equipment condition, available capacity or operational readiness.





Photo record of the BIG SUN AI Data Center signing ceremony with InnoDisk and the founders meeting.
Separate official service information from third-party prices
The report uses Chief Telecom as an industry reference and distinguishes official information from third-party colocation prices.
AI rack specifications and pricing
- The report says Chief Telecom plans to invest about NT$3.3 billion in an AI data center in Huwei, with operations expected in the second half of 2028.
- Published AI rack specifications are about 10–150 kW per rack; AI services are quoted by project.
- General colocation pricing items include setup fees, monthly rack rent and bandwidth rent. The official page does not publish one fixed monthly price for all AI customers.
- Media have quoted Chief management as saying LY2 AI rack rent is above traditional racks, without publishing an absolute rate that can be directly applied.
Neihu service examples
- 20U / 1 kW: about NT$27,000 per month.
- 42U / 2 kW: about NT$45,000 per month.
- Equivalent to roughly NT$22,500–27,000 per kW per month.
- These are third-party conventional colocation prices, not Chief's official AI data-center quote or high-density AI rack rates.
Compete for regional deployments with transparent compliance
The report states that in November 2026, the US Department of Commerce BIS announced new controls on advanced-computing chip exports and overseas remote-compute access. It lists additional licensing requirements for certain advanced chips shipped or transferred to Singapore, Malaysia, Indonesia, Thailand and Brazil. Overseas data centers providing substantial remote compute to entities in certain restricted regions may also face licensing and customer-screening requirements.
These are export and remote-compute licensing controls, not a blanket ban on all Southeast Asian data centers obtaining GPUs. Taiwan projects are not automatically exempt. Equipment access depends on chip model, end customer, use and applicable license conditions.
The opportunity thesis is that customers reconsidering facility locations and supply chains may consider Taiwan for data-center, compute and enterprise services. Transparent customer screening, equipment provenance and compute-service processes are needed.
Two leasing assumptions for a 6 MW facility scenario
Values are transcribed from the supplied report. Each depends on completed engineering, actual power, customer demand and operating costs.
| Scenario item | Base NT$4,000–6,000 / kW / month | High-density NT$10,000–12,000 / kW / month |
|---|---|---|
| Annual rental revenue | NT$177–266M | NT$443–532M |
| Gross profit (70% assumed) | NT$124–186M | NT$310–372M |
| Net profit (50% assumed) | NT$88.62–133M | NT$222–266M |
| EPS (20M shares) | NT$4.43–6.65 | NT$11.08–13.29 |
| Net profit / NT$200M target capital | about 44%–66% | about 111%–133% |
Conditional valuation reference
The report uses Chief Telecom's Nov. 26, 2026 closing price of NT$313.50 and P/E of about 19.7. Applying that multiple to high-density scenario EPS of NT$11.08–13.29 gives an illustrative NT$218–262 per share. BIG SUN and listed Chief differ in operating history, scale, risk and liquidity. This is not a target price, listing commitment or capital-gain guarantee.
Two payments, two sets of rights, documented separately
Current fundraising plan
- Target share capital for the data-center company: NT$200 million.
- BIG SUN and outside investors are planned to hold 50% each.
- The planned outside-investor payment is NT$25 per share: NT$10 for share subscription and NT$15 for factory-use rights.
- The two payments differ in recipient, use and rights, and should be set out separately in the share-subscription documents and factory-use rights agreement.
Governance and investment risk
- Governance is planned for 9 directors and 3 supervisors; actual seats, candidates and duties depend on the articles, formal resolutions and legal procedures.
- Engineering, compliance, customer onboarding, occupancy and profit assumptions are uncertain.
- Equity investment is not principal-protected and carries no fixed return, dividend or listing guarantee.
- Investors should review formal documents, the financial model and risk disclosures and make an independent assessment.
BIG SUN AI Data Center is a priority physical operating investment for the group
Chief Telecom's development and market information point to demand for AI data centers, alongside substantial capital needs and long build times. BIG SUN starts from its existing Hukou factory and seeks to shorten the development path. Changes to US advanced-chip and remote-compute rules may prompt customers to reconsider regional compute and facility locations. If engineering, compliance, customer onboarding and profit assumptions are achieved, the project could become an important operating platform and support a future Innovation Board listing evaluation.
This is a strategic thesis and conditional scenario, not a promise of returns, dividends, listing or capital gains.
References listed in the source report
These links are reproduced from the supplied investor report. Verify source contents and dates before public use.
Complete seven-page investor report
Includes the one-page poster, Hukou facility photos, partner signing and founders meeting, full narrative, assumptions and references.
Report dated Nov. 27, 2026; stock price and P/E data dated Nov. 26, 2026. Financials are scenarios, not forecasts or guarantees. Equity investment is not principal-protected. Formal approved and executed documents govern.